Loading...

    Explore
    • Policy Monitoring
    • Live Policy Feed
    • Billing Codes
    • Healthcare Providers
    • Health Insurance Payers
    • States
    • Service Lines
    • Taxonomy Codes
    Lookup tools
    • Billing Code Lookup
    • CPT Modifier Lookup
    • Provider Taxonomy Code Lookup
    • Healthcare Provider & Facility Lookup
    • Health Insurance Payer Lookup
    • Payer Contact Directory

    Policy & Benchmark Tools

    • Prior Authorization Lookup
    • Coverage Criteria Lookup
    • Timely Filing Lookup
    • Billing Code Reimbursement Rates
    • Payer Comparison Dashboard
    • Facility Comparison Dashboard
    • All tools

    Company

    • About OpenPayer
    • Data Sources
    • Request a Policy / Feedback
    • Trek Health
    OpenPayerby Trek Health
    LinkedInYouTube

    © 2026 Trek Health. All rights reserved.

    OpenPayer is built and maintained by Trek Health.

    v1.0.32
    OpenPayerPolicy UpdatesAdministrative/Operational PolicyKansas KDHE casing repair Prior Auth | OpenPayer
    Ask Trek AI about this page
    CurrentKansas Department of Health and EnvironmentPolicy HS -12

    Procedure for Internal Casing Repair

    Customize your policy alerts

    Sign up for Kansas Department of Health and Environment Policy HS -12 alerts

    Get alerted when Policy HS -12 changes without checking for updates manually.

    Monitor payer policy activity

    Receive email alerts as soon as relevant payer policies are published or updated.

    Governs requirements for submitting and executing plans to repair internal casing in underground hydrocarbon storage wells; applies to operators who perform casing repair activities under KDHE jurisdiction.

    Policy Summary
    PayerKansas Department of Health and Environment
    PolicyProcedure for Internal Casing Repair
    Policy CodePolicy HS -12
    Change TypeNo material changes
    Effective DateDec 1, 2025
    Next Review Date
    Key ActionOperator must submit a casing repair plan to KDHE and must not commence repair until KDHE approval is obtained.
    SourceLink
    POLICY UPDATE CHANGES

    No material clinical or coverage changes in this revision.

    24 hoursminimum wait time before pressure testing a patch
    6-8 ftrequired overlap of patch on each end
    gamma raylog to correlate leak and patch depth
    plan submissionapproval required before repair

    OpenPayer is powered by Trek Health's payer performance platform. Trek continuously ingests, validates, and normalizes Transparency in Coverage data alongside payer policies and other commercial payer data to create a structured payer intelligence foundation. OpenPayer uses this foundation to deliver personalized search results, dynamically generated policy pages, and tailored policy monitoring based on each user's payers, specialties, billing codes, and areas of interest. The same intelligence powers broader payer performance workflows, including reimbursement benchmarking, contract evaluation, payer negotiations, and financial decision-making.

    Casing Repair Plan and Procedure Requirements

    Casing repair plan and procedure requirements

    Required elements of the casing repair plan and the procedural steps to follow:

    Operator must submit a casing repair plan to KDHE and must not commence repair until KDHE approval is obtained.
    The casing shall be repaired in a manner that will ensure the integrity of the well is maintained.

    Plan contents

    • A schematic of the well configuration, including casing size and weight.
    • The condition of the well, including any restrictions in the casing, hole deviation, and condition of the cement.
    • The external and internal pressure rating of the casing patch.
    • A description of the leak, including the depth, type, size, diameter, length, and width.
    • A description of the method and equipment used to locate the leak.
    • A description of the hole preparation before running the casing patch.
    • A description of the casing patch and installation method.
    • A description of safety precautions to be used while running the casing patch and the procedure to be used if the casing patch becomes stuck.
    • A description of the method to be used to pressure test the casing patch.

    Procedure (sequenced steps)

    • Depressure the cavern by removing all product that can feasibly be removed; describe the procedure for removing product, including any product trapped behind the casing.
    • Fill the cavern with brine.
    • Remove all tubing string(s) from the well.
    • Conduct a casing evaluation to determine the condition of the entire casing string, including: the type of leak; the internal diameter of the casing to determine oversize; the position of the hold down; and the location of the leak.
    • Run a gamma ray log to correlate the depth of the leak and the patch position.
    • Initiate any hole preparations and procedures required for the type of leak identified and approved by KDHE for repair.

    Codes and Operational Timing

    Neutral Codesmixed
    Patch pressure test wait time
    Minimum wait time before pressure testingAllow the patch to set at least 24 hours before pressure testing; do not exceed differential pressure ratings provided by the manufacturer.
    Required overlap of patchOverlap the leak by 6-8 feet on each end; for corroded casing cover the full joint with a 6-8 foot overlap at each end.
    Pressure rating confirmationDetermine pressure requirements for the patch and confirm patch is designed for the size and weight of the casing; refer to manufacturer charts.

    Required Approvals and Reporting

    Prior Authorization

    Pre-approval requirement — submit casing repair plan and await KDHE approval

    Operator must submit a plan for casing repair to KDHE prior to repairing any casing in any underground hydrocarbon storage well and must not commence any repair operations until the plan is approved by KDHE.

    • Plan must include schematic of well configuration (casing size and weight); condition of the well (restrictions, hole deviation, cement condition); external and internal pressure rating of the casing patch; description of the leak (depth, type, size, diameter, length, width); method and equipment used to locate the leak; hole preparation before running the patch; description of the casing patch and installation method; safety precautions and procedure if patch becomes stuck; method to be used to pressure test the patch.
    Documentation Required

    Post-repair reporting — submit casing repair report to KDHE

    After completing the repair, the operator must submit a casing repair report to KDHE that includes a description of the field work performed.

    • Report must document the field work performed during the casing repair.

    Key Terms

    Plan (definition for casing repair)
    Definition of 'Plan'A submitted casing repair plan to KDHE that must be approved prior to commencing any repair operations; it shall ensure the integrity of the well is maintained.
    Required schematicInclude a schematic of the well configuration, including casing size and weight.
    Condition and ratingsDescribe the condition of the well (restrictions, hole deviation, cement) and the external and internal pressure rating of the casing patch.
    Leak and locating methodsDescribe the leak (depth, type, size, diameter, length, width) and the method and equipment used to locate the leak.
    Casing evaluation (definition)
    Casing evaluation scopeConduct a casing evaluation to determine condition of the entire casing string, including type of leak, internal diameter, position of hold down, and leak location.
    Gamma ray logRun a gamma ray log to correlate the depth of the leak and the patch position.
    Caliper logRun a casing caliper log if the internal diameter is unknown or questionable to determine reduction to inside diameter after patching.
    Gauge/drift and scrapingRun a casing scraper to clean the patch area and perform a gauge-or-drift run to identify restrictions and describe procedures to remove them.
    Policy Summary
    PayerKansas Department of Health and Environment
    PolicyProcedure for Internal Casing Repair
    Policy CodePolicy HS -12
    Change TypeNo material changes
    Effective DateDec 1, 2025
    Next Review Date
    Key ActionOperator must submit a casing repair plan to KDHE and must not commence repair until KDHE approval is obtained.
    SourceLink
    On This Page
    Casing Repair Plan and Procedure RequirementsCodes and Operational TimingRequired Approvals and ReportingKey Terms
    Run a casing scraper to clean the casing in the patch area.
  1. Make a gauge-or-drift run to identify any restrictions in the casing and describe tentative procedures for removing any restrictions.
  2. Run a casing caliper log if the internal diameter of the casing is not known or is questionable and determine the amount of reduction to the inside diameter after the patch is applied.
  3. Determine the pressure requirements for the patch and confirm the patch is designed for the size and weight of the casing (refer to manufacturer charts).
  4. Follow manufacturer's recommended safety precautions while running the patch.
  5. When setting the patch, overlap the leak by 6–8 feet on each end; when patching corroded casing, cover the full joint of casing with a 6–8 foot overlap at each end.
  6. Pressure test the patch; allow the patch to set at least 24 hours before testing and do not exceed differential pressure ratings provided by the manufacturer.
  7. Submit a casing repair report, including description of field work, to KDHE after repair.