Loading...

    Explore
    • Policy Monitoring
    • Live Policy Feed
    • Billing Codes
    • Healthcare Providers
    • Health Insurance Payers
    • States
    • Service Lines
    • Taxonomy Codes
    Lookup tools
    • Billing Code Lookup
    • CPT Modifier Lookup
    • Provider Taxonomy Code Lookup
    • Healthcare Provider & Facility Lookup
    • Health Insurance Payer Lookup
    • Payer Contact Directory

    Policy & Benchmark Tools

    • Prior Authorization Lookup
    • Coverage Criteria Lookup
    • Timely Filing Lookup
    • Billing Code Reimbursement Rates
    • Payer Comparison Dashboard
    • Facility Comparison Dashboard
    • All tools

    Company

    • About OpenPayer
    • Data Sources
    • Trek Health
    OpenPayerby Trek Health
    LinkedInYouTube

    © 2026 Trek Health. All rights reserved.

    OpenPayer is built and maintained by Trek Health.

    v1.0.31
    OpenPayerPolicy UpdatesCardiologyDevoted Health CCM Coverage Update | OpenPayer
    Ask Trek AI about this page
    CurrentDevoted HealthPolicy UMGT.CL.0001

    Cardiac Contractility Modulation Therapy Using the Optimizer Smart System

    Customize your policy alerts

    Sign up for devoted_health Policy UMGT.CL.0001 alerts

    Get alerted when Policy UMGT.CL.0001 changes without checking for updates manually.

    Monitor payer policy activity

    Receive email alerts as soon as relevant payer policies are published or updated.

    This policy governs Devoted Health coverage of cardiac contractility modulation therapy for members with heart failure. Coverage requires FDA-authorized indications, persistent symptoms despite optimized guideline-directed medical therapy, and participation in a CMS-approved coverage-with-evidence-development study.

    Policy Summary
    PayerDevoted Health
    PolicyCardiac Contractility Modulation Therapy Using the Optimizer Smart System
    Policy CodePolicy UMGT.CL.0001
    Change TypeMaterial revision
    Effective DateFebruary 10, 2025
    Last ReviewFeb 9, 2026
    Next Review DateFebruary 15, 2027
    Key ActionBefore CCM implantation, verify FDA market-authorized indications, at least 3 months of optimized GDMT, and treatment in a CMS-approved CED study.
    SourceLink
    POLICY UPDATE CHANGES

    The policy coverage criteria were aligned with CMS National Coverage Determination 20.39 in the April 13, 2026 ad hoc update.

    All plansPlan applicability
    3 monthsMinimum optimized GDMT
    CMS-approved CEDRequired study setting

    OpenPayer is powered by Trek Health's payer performance platform. Trek continuously ingests, validates, and normalizes Transparency in Coverage data alongside payer policies and other commercial payer data to create a structured payer intelligence foundation. OpenPayer uses this foundation to deliver personalized search results, dynamically generated policy pages, and tailored policy monitoring based on each user's payers, specialties, billing codes, and areas of interest. The same intelligence powers broader payer performance workflows, including reimbursement benchmarking, contract evaluation, payer negotiations, and financial decision-making.

    4
    Applicable procedure codes
    Not coveredOutside-study coverage

    CCM Therapy Coverage Criteria

    CCM Therapy Coverage

    Covered when ALL of the following criteria are met:

    ALL of the following

    • The member meets the FDA market-authorized indications for use and remains symptomatic despite at least 3 months of optimized guideline-directed medical therapy (GDMT), as determined by the heart team prior to CCM implantation.
    • The cardiac contractility modulation (CCM) therapy using the Optimizer® Smart system, including related items and services, is furnished in the context of a CMS-approved Coverage with Evidence Development (CED) study.

    CCM for heart failure management is not covered for patients outside of a CMS-approved study.

    Applicable Codes and Therapy Requirements

    Covered CPT CodesCPTCovered
    0408TInsertion or replacement of permanent cardiac contractility modulation system, including contractility evaluation when performed, and programming of sensing and therapeutic parameters; pulse generator with transvenous electrodes.
    0409TInsertion or replacement of permanent cardiac contractility modulation system, including contractility evaluation when performed, and programming of sensing and therapeutic parameters; pulse generator only
    0410TInsertion or replacement of permanent cardiac contractility modulation system, including contractility evaluation when performed, and programming of sensing and therapeutic parameters; atrial electrode only
    0411TInsertion or replacement of permanent cardiac contractility modulation system, including contractility evaluation when performed, and programming of sensing and therapeutic parameters; ventricular electrode only
    Optimized guideline-directed medical therapy
    TherapyCardiac contractility modulation (CCM) therapy using the Optimizer® Smart system
    Minimum durationAt least 3 months of optimized guideline-directed medical therapy before CCM implantation
    Determined byThe heart team

    Provider Eligibility and Coverage Risks

    Documentation Required

    Required Clinical and Study Eligibility

    Coverage requires that the member meet the FDA market-authorized indications for use, remain symptomatic despite at least 3 months of optimized guideline-directed medical therapy (GDMT) as determined by the heart team before CCM implantation, and receive CCM and related items and services in a CMS-approved Coverage with Evidence Development (CED) study.

    • Confirm FDA market-authorized indications are met.
    • Document persistent symptoms despite at least 3 months of optimized GDMT, as determined by the heart team, before implantation.
    • Verify that CCM and related items and services are furnished in the context of a CMS-approved CED study.
    Denial Risk

    Failure to Meet Coverage Criteria

    Coverage is not available when the member does not meet the FDA market-authorized indications, is not symptomatic despite optimized GDMT, or has not completed at least 3 months of optimized GDMT before CCM implantation.

    Cardiac Contractility Modulation Therapy

    Cardiac contractility modulation (CCM) therapy uses the Optimizer Smart system to deliver synchronized, relatively high-intensity electrical stimulation to the right ventricular septum during the heart’s absolute refractory period. The therapy is intended to increase the strength of cardiac contractions rather than trigger a new contraction. The policy notes improvements in quality of life and exercise capacity, but limited demonstrated impact on hospitalization and mortality; current clinical guidelines do not recommend CCM.

    Policy Definitions

    CED
    AbbreviationCED
    Full termCoverage with Evidence Development
    Policy settingCCM and related items and services must be furnished in the context of a CMS-approved CED study
    CMS
    AbbreviationCMS
    Full termCenters for Medicare and Medicaid Services
    Policy referenceCMS-approved CED study
    Policy Summary
    PayerDevoted Health
    PolicyCardiac Contractility Modulation Therapy Using the Optimizer Smart System
    Policy CodePolicy UMGT.CL.0001
    Change TypeMaterial revision
    Effective DateFebruary 10, 2025
    Last ReviewFeb 9, 2026
    Next Review DateFebruary 15, 2027
    Key ActionBefore CCM implantation, verify FDA market-authorized indications, at least 3 months of optimized GDMT, and treatment in a CMS-approved CED study.
    SourceLink
    On This Page
    CCM Therapy Coverage CriteriaApplicable Codes and Therapy RequirementsProvider Eligibility and Coverage RisksCardiac Contractility Modulation TherapyPolicy Definitions
    • FDA market-authorized indications not met.
    • Member is not persistently symptomatic despite optimized GDMT.
    • At least 3 months of optimized GDMT before implantation is not documented.
    Denial Risk

    CCM Outside an Approved Study

    CCM for heart failure management is not covered when furnished outside the context of a CMS-approved CED study.

    • CCM and related items and services must be furnished in a CMS-approved CED study.
    • CCM provided outside an approved study is not covered.
    UM
    AbbreviationUM
    Full termUtilization Management
    Source sectionAcronyms and Definitions
    NCD
    AbbreviationNCD
    Full termNational Coverage Determination
    Source sectionAcronyms and Definitions